Wednesday, April 28, 2010

Second Level Progress and Diagram

The progress on the second level has been slower than I wish. My wife always reminds me that things always take longer than you anticipate.

I have been laying track and adding feeder wire to the track. I have been working on frogs and points. I have wired a couple Tortoise slow motion turnout motors. Still lots to do.

Here is a labeled layout diagram of the second level.

I am working on the main track and the sidings first. The wye at Surf will be next followed by tracks into Lompoc and then on to White Hills.

I will try to post every couple of weeks or when something substantial is completed.